2016 TAIKO KIKAI LTD 128-005 Die Cutting Machine
- Lot:
- A3-26698-1
- Genk, BE
Collection on fixed days
- Current bid
- Status
Activate Auto-bid
Recommended
About this lot
Consisting of:
1 unwinding unit and 2 magnetic rollers including dia 180 and 187, equipped with digital control MITUTOYO KA200,
Double punching roller and output/roll-up unit equipped with 2x 6 rolls,
Central digital control SIEMENS Simatic plc, 3 digital control cabinets STORK and
inkjet code printer GETRA VideoJet 1520,
Complete with metal security fence with 6 security doors
and new spare magnetic roller 170 cm lying in wooden box (WITHOUT mounted roller on box)
- Remarks:
- Complete with the accompanying electricity box, Issue as directed, Plot must be professionally dismantled by the customer himself without causing any damage to the existing infrastructure
- Lot number:
- A3-26698-1
- Location:
- Genk, BE
- Sold by:
- Individual seller
Lot specifications
- Quantity
- 1
- Margin
- No
- Brand
- TAIKO KIKAI LTD
- Type
- 128-005
- Year of build
- 2016
- Digital display
- Yes
- Electric connection
- 400V
- Dimension l
- 20000mm
- Dimension W
- 4600mm
- Dimension h
- 2500mm
Documents
Attention please!
Lots 27, 49, 59 and 94 were taken offline.
Attention regarding viewing day: You must register for the viewing day. Send an email with first name, last name, email address and license plate to planning@vavato.com for access. Access to the site is not permitted without a pre-registration.
Attention regarding delivery: Before the drop-off day, you must register. Send an email with first name, last name, email address and license plate until 13/12/2024 9:00 am to planning@vavato.com for access. Access to the site is not permitted without a pre-registration. Before the delivery day, in the case of your own forklift, a valid forklift certificate must be submitted, as well as a mandatory lifting plan for all lifting work must be submitted prior to the delivery dates.
Loading assistance is provided on site for the loading of the smaller assets (max 2.5 tonnes). Waiting times can be long. Trucks for transport must be equipped with a tailgate at the rear and have the possibility to dock at the existing loading dock.
Electrical installations will be decoupled from electricity, compressed air and water. The sprinkler system will have been removed from the containers.